Kensington Pond Footbridge, Centennial Park

 

What we’re doing in Centennial Park

We are working with Centennial Parklands to construct a new pedestrian footbridge over Kensington Pond to connect Centennial Park with the CBD and South East Light Rail along Alison Road, Randwick. The project is expected to start in April 2020 and is expected to be completed by November 2020, weather permitting.

Work we will be doing includes:

  • Construction of a temporary access way
  • Construction of our piling platform
  • Piling works for the footbridge
  • Installation of the footbridge superstructure
  • Installation of the decking, architectural balustrade and handrail

This work will require the use of an excavator, tip trucks, bobcat, roller, site fencing, hiab-crane trucks and hand tools.

Location of the works

Construction of work will take place in Centennial Park along the western bank of Kensington Pond.

How will these works affect you?

Some of this work will be noisy. All work is to be held during standard hours and vehicles will be switched off when not in use. Any dust generating activities will be watered down.

Access

There will be minor footpath closures within the parklands on the northern side of Kensington Pond footbridge. Pedestrians should refer to localised directional signage.

There will be no impact to the shared path along Alison Road. Access to the parklands from Alison Road remains via the gates on Darley Road.

Kensington pond

Hours of work

We will be working within the following standard hours:

Mon-Friday 7am-6pm
Sat 8am-1pm

Traffic Impacts

You may experience some disruption in Centennial Park, however impacts will be minimised wherever possible. Traffic Control will be in place. No vehicular detours will be made. However there will be no pedestrian access to the western bank of Kensington Pond.

Keeping you informed

You will receive advanced notification if any additional overnight works are required.

Please visit www.mysydney.nsw.gov.au for current construction notifications.

Contact information

We apologise for any disruption or inconvenience caused during this important work. For general project enquiries, please call 1800 684 490 or email projects@transport.nsw.gov.au. If you have any urgent enquiries or complaints during these works, please contact the 24-hour Construction Response Line on 1800 775 465.